Files
smom-dbis-138/docs/templates/DEPLOYMENT_GUIDE_TEMPLATE.md
defiQUG 1fb7266469 Add Oracle Aggregator and CCIP Integration
- Introduced Aggregator.sol for Chainlink-compatible oracle functionality, including round-based updates and access control.
- Added OracleWithCCIP.sol to extend Aggregator with CCIP cross-chain messaging capabilities.
- Created .gitmodules to include OpenZeppelin contracts as a submodule.
- Developed a comprehensive deployment guide in NEXT_STEPS_COMPLETE_GUIDE.md for Phase 2 and smart contract deployment.
- Implemented Vite configuration for the orchestration portal, supporting both Vue and React frameworks.
- Added server-side logic for the Multi-Cloud Orchestration Portal, including API endpoints for environment management and monitoring.
- Created scripts for resource import and usage validation across non-US regions.
- Added tests for CCIP error handling and integration to ensure robust functionality.
- Included various new files and directories for the orchestration portal and deployment scripts.
2025-12-12 14:57:48 -08:00

142 lines
2.2 KiB
Markdown

# Deployment Guide: [Component Name]
**Last Updated**: YYYY-MM-DD
**Status**: Active
**Component**: Name of component being deployed
## Table of Contents
- [Overview](#overview)
- [Prerequisites](#prerequisites)
- [Pre-Deployment Checklist](#pre-deployment-checklist)
- [Deployment Steps](#deployment-steps)
- [Verification](#verification)
- [Post-Deployment](#post-deployment)
- [Troubleshooting](#troubleshooting)
- [Rollback](#rollback)
## Overview
Brief description of what this deployment guide covers.
> **Related Documentation**:
> - [Deployment Quick Start](../DEPLOYMENT_QUICK_START.md) - Fast deployment
> - [Deployment Checklist](../deployment/DEPLOYMENT_CHECKLIST.md) - Checklist
> - [Architecture Documentation](../architecture/ARCHITECTURE.md) - System architecture
## Prerequisites
### Required Tools
- Tool 1 (version X.Y)
- Tool 2 (version X.Y)
### Required Access
- Access 1
- Access 2
### Required Configuration
- Configuration file 1
- Environment variables
## Pre-Deployment Checklist
- [ ] Prerequisite 1 completed
- [ ] Prerequisite 2 completed
- [ ] Configuration verified
- [ ] Backup completed (if applicable)
## Deployment Steps
### Step 1: Preparation
```bash
# Preparation command
prep-command
```
### Step 2: Deployment
```bash
# Deployment command
deploy-command
```
### Step 3: Configuration
```bash
# Configuration command
config-command
```
## Verification
### Check 1
```bash
# Verification command
verify-command
```
**Expected Output**:
```
Expected output here
```
### Check 2
```bash
# Another verification
verify-command-2
```
## Post-Deployment
### Immediate Actions
1. Action 1
2. Action 2
### Monitoring
- Monitor metric 1
- Monitor metric 2
## Troubleshooting
### Issue: Deployment Failed
**Symptoms**: Description
**Solution**: Steps to resolve
```bash
# Troubleshooting command
troubleshoot-command
```
## Rollback
If deployment fails, follow these rollback steps:
1. Rollback step 1
2. Rollback step 2
```bash
# Rollback command
rollback-command
```
## Related Documentation
- [Deployment Guide](../deployment/DEPLOYMENT.md)
- [Troubleshooting Guide](../guides/TROUBLESHOOTING.md)
---
**Last Updated**: YYYY-MM-DD
**Next Review**: YYYY-MM-DD