# TODO Summary ## Overview This document summarizes all pending tasks organized by category. All core functionality is complete - these are recommendations for enhanced testing, production readiness, and operational excellence. ## Test Coverage (45 tasks) ### Unit Tests - Adapters (9 tasks) - Aave V3 adapter tests - Compound V3 adapter tests - Uniswap V3 adapter tests - MakerDAO adapter tests - Balancer adapter tests - Curve adapter tests - Lido adapter tests - Aggregator adapter tests - Perps adapter tests ### Unit Tests - Guards (5 tasks) - Oracle sanity guard tests ✅ (created) - TWAP sanity guard tests - Min health factor guard tests ✅ (created) - Max gas guard tests - Slippage guard tests - Position delta limit guard tests ### Unit Tests - Core Components (3 tasks) - Price oracle tests ✅ (created) - Gas estimation tests - Strategy compiler tests (all action types) ### Integration Tests (10 tasks) - Full strategy execution tests (recursive, liquidation, stablecoin hedge, multi-protocol) - Flash loan scenario tests - Guard evaluation tests ✅ (created) - Error handling tests ### Foundry Tests (10 tasks) - Flash loan callback tests ✅ (created) - Edge case tests (empty batch, large batch, reentrancy, delegatecall, value handling) - Security tests ### E2E Tests (7 tasks) - Fork simulation tests - Cross-chain tests (CCIP, LayerZero, message status) ### Test Infrastructure (3 tasks) - Test utilities creation - Test fixtures creation - Coverage reporting setup ## Production Readiness (64 tasks) ### Security & Audit (3 tasks) - Professional smart contract audit - Internal security code review - Penetration testing ### Configuration (6 tasks) - Address verification - Address testing on chains - Address documentation - RPC endpoint setup - Private key configuration (hardware wallet) - Monitoring setup ### Multi-Sig & Access Control (3 tasks) - Multi-sig setup (3-of-5) - Separate signers configuration - Emergency pause procedures ### Deployment Strategy (5 tasks) - Testnet deployment and testing - Mainnet deployment (limited) - Gradual rollout - Position limit increases ### Monitoring & Alerting (13 tasks) - Transaction failure alerts - Guard failure alerts - Gas usage alerts - Price oracle alerts - Health factor alerts - RPC provider alerts - Slippage alerts - Unusual activity alerts - Balance change alerts - Transaction explorer - Gas tracker - Price feed monitor - Health dashboard ### Operational Procedures (5 tasks) - Emergency procedures documentation - Regular maintenance schedule - Backup executor deployment - State snapshot setup - Recovery procedures documentation ### Performance Optimization (6 tasks) - Gas usage optimization - Batch size optimization - Connection pooling - Price data caching - Address/ABI caching - Gas estimate caching ### Documentation (9 tasks) - API documentation (JSDoc) - Strategy authoring guide - Deployment guide - Troubleshooting guide - Security best practices - Architecture deep dive - Protocol integration guide - Guard development guide - Performance tuning guide ### Risk Management (3 tasks) - Risk assessment - DeFi insurance consideration - Position/gas limits ### Compliance & Legal (4 tasks) - Regulatory compliance review - Terms of service - Privacy policy - Risk disclaimers ### Post-Deployment (7 tasks) - First week monitoring (24/7) - First week transaction review - First month usage analysis - Weekly status reports - Monthly metrics review - Quarterly security review - Annual comprehensive review ## Priority Levels ### High Priority (Do First) 1. Security audit 2. Address verification 3. Testnet deployment 4. Critical monitoring setup 5. Emergency procedures ### Medium Priority 6. Comprehensive test coverage 7. Production deployment 8. Performance optimization 9. Documentation ### Low Priority (Nice to Have) 10. Advanced monitoring features 11. Extended documentation 12. Compliance documentation ## Progress Tracking - **Total Tasks**: 109 - **Completed**: 4 (sample tests created) - **Pending**: 105 - **In Progress**: 0 ## Next Steps 1. Start with high-priority security and testing tasks 2. Set up basic monitoring before deployment 3. Deploy to testnet and validate 4. Gradually expand to production 5. Continuously improve based on metrics