Files
smom-dbis-138/docs/archive/bridge-trustless-milestones/OPERATIONAL_TASKS_STATUS.md

4.1 KiB

Operational Tasks Status

Overview

This document tracks the status of all operational tasks required for production deployment.

Task Status

Task 1: External Security Audit - PREPARED

Status: Complete preparation, ready for scheduling

Completed:

  • Audit package prepared
  • Audit request template created
  • Audit tracking system created
  • Audit firm selection helper created
  • Documentation complete

Files:

  • scripts/bridge/trustless/operations/schedule-audit.sh
  • docs/bridge/trustless/audit/audit-request-template.md
  • docs/bridge/trustless/audit/audit-tracking.json
  • scripts/bridge/trustless/select-audit-firm.sh

Next Action: Contact audit firms and schedule audit

Task 2: Multisig Deployment - PREPARED

Status: Complete deployment infrastructure ready

Completed:

  • Multisig deployment scripts created
  • Production deployment procedure created
  • Ownership transfer scripts created
  • Operation scripts created
  • Documentation complete

Files:

  • scripts/bridge/trustless/multisig/deploy-multisig.sh
  • scripts/bridge/trustless/operations/deploy-multisig-production.sh
  • scripts/bridge/trustless/multisig/transfer-ownership.sh
  • scripts/bridge/trustless/multisig/propose-upgrade.sh
  • scripts/bridge/trustless/multisig/propose-pause.sh
  • scripts/bridge/trustless/multisig/execute-proposal.sh
  • docs/bridge/trustless/MULTISIG_OPERATIONS.md

Next Action: Deploy Gnosis Safe multisig on mainnet

Task 3: Production Configuration - PREPARED

Status: Configuration templates and validation ready

Completed:

  • Production .env template created
  • Configuration validation script created
  • Deployment checklist created
  • All configuration parameters documented

Files:

  • config/production/.env.production.template
  • config/production/validate-production-config.sh
  • config/production/production-deployment-checklist.md

Next Action: Fill in production values and validate

Task 4: Load Testing - PREPARED

Status: Load testing scripts and procedures ready

Completed:

  • Load test script created
  • Test runner created
  • Test scenarios documented
  • Performance targets defined

Files:

  • scripts/bridge/trustless/operations/load-test.sh
  • scripts/bridge/trustless/operations/load-test-runner.js

Next Action: Execute load tests on testnet/mainnet

Task 5: Disaster Recovery Testing - PREPARED

Status: DR test scenarios and procedures ready

Completed:

  • DR test scenarios created (4 scenarios)
  • DR test runner created
  • Recovery procedures documented
  • Test framework ready

Files:

  • scripts/bridge/trustless/operations/disaster-recovery-test.sh
  • scripts/bridge/trustless/operations/dr-test-runner.sh
  • tests/disaster-recovery/test-pause-recovery.sh
  • tests/disaster-recovery/test-rpc-outage.sh
  • tests/disaster-recovery/test-liquidity-crisis.sh
  • tests/disaster-recovery/test-multisig-recovery.sh

Next Action: Execute disaster recovery tests

Summary

All Operational Tasks: PREPARED AND READY

All operational tasks have been prepared with:

  • Complete scripts and procedures
  • Configuration templates
  • Testing frameworks
  • Comprehensive documentation
  • Execution checklists

Status: Ready for execution when moving to production.

Execution Order

  1. Security Audit (can start immediately)

    • Contact firms
    • Schedule audit
    • Provide audit package
  2. Production Configuration (can start immediately)

    • Fill in configuration
    • Validate settings
    • Review checklist
  3. Multisig Deployment (after audit or in parallel)

    • Deploy Gnosis Safe
    • Transfer ownership
    • Test operations
  4. Load Testing (before mainnet)

    • Run on testnet first
    • Validate performance
    • Optimize if needed
  5. Disaster Recovery Testing (before mainnet)

    • Run all scenarios
    • Verify recovery procedures
    • Document results

Quick Start

Run complete operational setup:

bash scripts/bridge/trustless/operations/complete-operational-setup.sh

This prepares all operational infrastructure in one command.