- Introduced Aggregator.sol for Chainlink-compatible oracle functionality, including round-based updates and access control. - Added OracleWithCCIP.sol to extend Aggregator with CCIP cross-chain messaging capabilities. - Created .gitmodules to include OpenZeppelin contracts as a submodule. - Developed a comprehensive deployment guide in NEXT_STEPS_COMPLETE_GUIDE.md for Phase 2 and smart contract deployment. - Implemented Vite configuration for the orchestration portal, supporting both Vue and React frameworks. - Added server-side logic for the Multi-Cloud Orchestration Portal, including API endpoints for environment management and monitoring. - Created scripts for resource import and usage validation across non-US regions. - Added tests for CCIP error handling and integration to ensure robust functionality. - Included various new files and directories for the orchestration portal and deployment scripts.
169 lines
3.8 KiB
Markdown
169 lines
3.8 KiB
Markdown
# Execution Roadmap
|
|
|
|
## 🗺️ Complete Execution Plan
|
|
|
|
### Phase 1: Critical Path (Week 1)
|
|
|
|
#### Day 1-2: CCIPLogger Deployment
|
|
- [ ] Fix Hardhat dependency resolution
|
|
- [ ] Deploy CCIPLogger to Mainnet
|
|
- [ ] Verify deployment
|
|
- [ ] Update documentation
|
|
|
|
#### Day 3-4: Chain-138 Infrastructure
|
|
- [ ] Verify Chain-138 RPC endpoint
|
|
- [ ] Identify and verify CCIP Router
|
|
- [ ] Test infrastructure connectivity
|
|
- [ ] Document infrastructure details
|
|
|
|
#### Day 5: Chain-138 Bridge Deployment
|
|
- [ ] Deploy CCIPWETH9Bridge on Chain-138
|
|
- [ ] Deploy CCIPWETH10Bridge on Chain-138
|
|
- [ ] Verify deployments
|
|
- [ ] Update .env with addresses
|
|
|
|
### Phase 2: Configuration & Testing (Week 2)
|
|
|
|
#### Day 1-2: Bridge Configuration
|
|
- [ ] Configure WETH9 bridge destinations
|
|
- [ ] Configure WETH10 bridge destinations
|
|
- [ ] Verify configurations
|
|
- [ ] Test destination queries
|
|
|
|
#### Day 3-4: Basic Testing
|
|
- [ ] Pre-testing setup
|
|
- [ ] Test WETH9 transfers (both directions)
|
|
- [ ] Test WETH10 transfers (both directions)
|
|
- [ ] Document test results
|
|
|
|
#### Day 5: Edge Case Testing
|
|
- [ ] Test edge cases
|
|
- [ ] Test failure scenarios
|
|
- [ ] Verify error handling
|
|
- [ ] Document findings
|
|
|
|
### Phase 3: Monitoring & Documentation (Week 3)
|
|
|
|
#### Day 1-2: Monitoring Setup
|
|
- [ ] Set up Etherscan alerts
|
|
- [ ] Configure event monitoring
|
|
- [ ] Set up balance monitoring
|
|
- [ ] Configure CCIP message tracking
|
|
|
|
#### Day 3-4: Dashboard & Alerts
|
|
- [ ] Create monitoring dashboard
|
|
- [ ] Configure alerting
|
|
- [ ] Test alert system
|
|
- [ ] Document monitoring procedures
|
|
|
|
#### Day 5: Documentation
|
|
- [ ] Update technical documentation
|
|
- [ ] Create operational runbooks
|
|
- [ ] Create user documentation
|
|
- [ ] Review and finalize
|
|
|
|
### Phase 4: Production Readiness (Week 4)
|
|
|
|
#### Day 1-2: Security Review
|
|
- [ ] Review access controls
|
|
- [ ] Verify security measures
|
|
- [ ] Consider professional audit
|
|
- [ ] Document security findings
|
|
|
|
#### Day 3-4: Final Testing
|
|
- [ ] Comprehensive testing
|
|
- [ ] Performance testing
|
|
- [ ] Load testing
|
|
- [ ] Final verification
|
|
|
|
#### Day 5: Go-Live Preparation
|
|
- [ ] Final checks
|
|
- [ ] Production readiness review
|
|
- [ ] Go-live decision
|
|
- [ ] Production deployment
|
|
|
|
---
|
|
|
|
## 📊 Task Dependencies
|
|
|
|
```
|
|
CCIPLogger Deployment
|
|
↓
|
|
Chain-138 Infrastructure Setup
|
|
↓
|
|
Chain-138 Bridge Deployment
|
|
↓
|
|
Bridge Configuration
|
|
↓
|
|
Cross-Chain Testing
|
|
↓
|
|
Monitoring Setup
|
|
↓
|
|
Production Readiness
|
|
```
|
|
|
|
---
|
|
|
|
## ⚠️ Risk Mitigation
|
|
|
|
### High-Risk Items
|
|
1. **CCIPLogger Deployment**
|
|
- Risk: Dependency resolution blocking deployment
|
|
- Mitigation: Alternative deployment methods ready
|
|
|
|
2. **Chain-138 Infrastructure**
|
|
- Risk: Infrastructure not ready
|
|
- Mitigation: Verify infrastructure before deployment
|
|
|
|
3. **Cross-Chain Testing**
|
|
- Risk: Transfers may fail
|
|
- Mitigation: Start with small amounts, test thoroughly
|
|
|
|
### Medium-Risk Items
|
|
1. **Bridge Configuration**
|
|
- Risk: Configuration errors
|
|
- Mitigation: Verify configurations, test thoroughly
|
|
|
|
2. **Monitoring Setup**
|
|
- Risk: Missing critical alerts
|
|
- Mitigation: Comprehensive monitoring, test alerts
|
|
|
|
---
|
|
|
|
## ✅ Success Metrics
|
|
|
|
### Deployment Metrics
|
|
- All contracts deployed and verified
|
|
- All configurations complete
|
|
- All addresses documented
|
|
|
|
### Testing Metrics
|
|
- 100% test coverage for critical paths
|
|
- All edge cases tested
|
|
- Performance benchmarks met
|
|
|
|
### Operational Metrics
|
|
- Monitoring operational
|
|
- Alerts configured and tested
|
|
- Documentation complete
|
|
|
|
---
|
|
|
|
## 🎯 Milestones
|
|
|
|
### Milestone 1: Deployment Complete
|
|
- [ ] All contracts deployed
|
|
- [ ] All configurations complete
|
|
- [ ] Basic testing passed
|
|
|
|
### Milestone 2: Testing Complete
|
|
- [ ] Comprehensive testing done
|
|
- [ ] Edge cases tested
|
|
- [ ] Performance verified
|
|
|
|
### Milestone 3: Production Ready
|
|
- [ ] Monitoring operational
|
|
- [ ] Documentation complete
|
|
- [ ] Security review passed
|
|
- [ ] Go-live approved
|