- Introduced Aggregator.sol for Chainlink-compatible oracle functionality, including round-based updates and access control. - Added OracleWithCCIP.sol to extend Aggregator with CCIP cross-chain messaging capabilities. - Created .gitmodules to include OpenZeppelin contracts as a submodule. - Developed a comprehensive deployment guide in NEXT_STEPS_COMPLETE_GUIDE.md for Phase 2 and smart contract deployment. - Implemented Vite configuration for the orchestration portal, supporting both Vue and React frameworks. - Added server-side logic for the Multi-Cloud Orchestration Portal, including API endpoints for environment management and monitoring. - Created scripts for resource import and usage validation across non-US regions. - Added tests for CCIP error handling and integration to ensure robust functionality. - Included various new files and directories for the orchestration portal and deployment scripts.
2.1 KiB
2.1 KiB
Governance Framework
Overview
This document outlines the governance framework for the DeFi Oracle Meta Mainnet (ChainID 138).
Governance Structure
Admin Role
The admin role has full control over:
- Oracle aggregator configuration
- CCIP router configuration
- Transmitter management
- Fee configuration
Transmitter Role
Transmitters can:
- Update oracle answers
- Submit oracle data
Proposal Process
1. Proposal Creation
Proposals can be created for:
- Parameter changes (heartbeat, deviation threshold)
- Transmitter additions/removals
- Fee adjustments
- Contract upgrades
2. Proposal Review
- Technical review
- Security assessment
- Impact analysis
3. Proposal Execution
- Admin approval required
- Multi-sig for critical changes
- Timelock for major upgrades
Voting Mechanisms
Current Implementation
- Admin-based governance
- Single admin address
- Immediate execution
Future Enhancements
- Multi-sig admin
- Timelock contracts
- On-chain voting
- DAO governance
Upgrade Procedures
Contract Upgrades
- Proposal: Create upgrade proposal
- Review: Technical and security review
- Testing: Test on testnet
- Approval: Admin approval
- Execution: Deploy upgrade
- Verification: Verify upgrade success
Parameter Changes
- Proposal: Document parameter change
- Review: Impact assessment
- Approval: Admin approval
- Execution: Execute parameter change
- Monitoring: Monitor impact
Security Controls
Access Control
- Admin role restricted
- Transmitter whitelist
- Multi-sig for critical operations
Audit Requirements
- Security audits before upgrades
- Code review for all changes
- Testing on testnet
Compliance Requirements
Documentation
- All changes documented
- Audit trails maintained
- Incident reports filed
Reporting
- Regular status reports
- Incident notifications
- Security updates
Best Practices
- Transparency: Document all decisions
- Security: Security-first approach
- Testing: Test all changes
- Monitoring: Monitor all changes
- Documentation: Maintain documentation