DBIS RTGS — master plan implementation tracker
Last updated: 2026-04-25
Purpose: Executable tracker mapping the multi-jurisdiction institutional onboarding master plan to DBIS_RTGS_E2E_REQUIREMENTS_MATRIX.md rows and slice-1 scope (SLICE1_SCOPE_FREEZE.md). Status here is documentation of intent; the canonical component status remains the E2E matrix until rows are updated there.
How to use
- Pick a workstream below.
- Execute engineering / ops tasks until exit criteria match the matrix row’s Production gate column.
- Update DBIS_RTGS_E2E_REQUIREMENTS_MATRIX.md
Current state to Complete (or Retired with rationale).
- Link evidence to URA packages per ID-INDONESIA/banking_v1.md where applicable.
Workstream W1 — Canonical OMNL / Fineract rail
| Matrix rows (indicative) |
OMNL / Fineract API rail; Mifos X frontend / tenant |
| Exit criteria |
Tenant and operator rail frozen; reproducible posting, office/GL mapping, reconciliation package path. |
| Owner |
OMNL / banking ops |
| URA link |
SERVER_FUNDS resources get real accountingRef; URA_PILOT_CLOSURE_RUNBOOK.md pilot 2. |
Workstream W2 — server-funds-sidecar
| Matrix rows |
server-funds-sidecar (VMID 5803) |
| Exit criteria |
Treasury SoR boundaries frozen; draw / hold / release validated with auth; Phoenix SERVER_FUNDS_SIDECAR_URL set in prod. |
| Owner |
HYBX integration lead |
| URA link |
Pilot 2; UNIVERSAL_RESOURCE_WIRING.md probe returns 200. |
Workstream W3 — off-ledger-2-on-ledger-sidecar
| Matrix rows |
Off-ledger → Chain 138 settlement |
| Exit criteria |
Canonical event → settlement end-to-end with durable evidence; finality handling closed. |
| Owner |
HYBX + Chain 138 settlement lead |
| URA link |
settlementOrChainRef in evidence packages. |
Workstream W4 — ISO 20022 + institutional 4.995 package
| Matrix rows |
ISO evidence and vault path; Institutional 4.995 package path |
| Exit criteria |
--strict or institution-agreed readiness; reproducible archive/hash path. |
| Owner |
Regulatory / compliance + eng |
| Compliance link |
INDONESIA_PACKAGE_4_995_EVIDENCE_STANDARD.md |
Workstream W5 — Indonesia BNI domestic path
| Matrix rows |
Indonesia / BNI domestic banking path |
| Exit criteria |
Live endpoint/auth/message contract or explicit deferral documented in matrix + jurisdiction matrix. |
| Owner |
Indonesia banking integration lead |
| Compliance link |
DBIS_OMNL_INDONESIA_BNI_E2E_INTEGRATION_BLUEPRINT.md |
Workstream W6 — Global correspondent path
| Matrix rows |
Global correspondent / liquidity bank path |
| Exit criteria |
Same as matrix production gate; cross-border flow validated or out of slice 1. |
| Owner |
Cross-border banking integration lead |
Workstream W7 — Identity stack (Fabric / Indy / Aries)
| Matrix rows |
Fabric, Indy, Aries, AnonCreds, etc. |
| Exit criteria |
Scope decision in/out slice 1; if out, matrix shows Planned/Retired without production claims. |
| Owner |
Identity architecture lead |
Workstream W8 — Depository / custody / securities
| Matrix rows |
Depository, global custodian, securities-sidecar, custody flow |
| Exit criteria |
Canonical lifecycle documented + one path validated or deferred with rationale. |
| Owner |
Custody / securities architecture leads |
| URA link |
Pilot 1 SKR; policy profile institutional_custody_skr_v1. |
Workstream W9 — RTGS production gate
| Matrix rows |
RTGS production gate row |
| Exit criteria |
All mandatory rows for chosen architecture = Complete. |
| Owner |
DBIS program owner |