Some checks failed
Deploy to Phoenix / deploy (push) Has been cancelled
- ADD_CHAIN138_TO_LEDGER_LIVE: Ledger form done; public code review repo bis-innovations/LedgerLive; init/push commands - CONTRACT_DEPLOYMENT_RUNBOOK: Chain 138 gas price 1 gwei, 36-addr check, TransactionMirror workaround - CONTRACT_*: AddressMapper, MirrorManager deployed 2026-02-12; 36-address on-chain check - NEXT_STEPS_FOR_YOU: Ledger done; steps completable now (no LAN); run-completable-tasks-from-anywhere - MASTER_INDEX, OPERATOR_OPTIONAL, SMART_CONTRACTS_INVENTORY_SIMPLE: updates - LEDGER_BLOCKCHAIN_INTEGRATION_COMPLETE: bis-innovations/LedgerLive reference Co-authored-by: Cursor <cursoragent@cursor.com>
4.0 KiB
4.0 KiB
Blockchain Stability - Implementation Roadmap
Last Updated: 2026-01-31
Document Version: 1.0
Status: Active Documentation
Date: 2025-01-20
Status: 📋 READY FOR IMPLEMENTATION
Quick Start Implementation
Week 1: Critical Stability (Days 1-7)
Day 1-2: Configuration Standardization
- Run
scripts/monitoring/auto-fix-validator-config.shon all validators - Verify all configuration files are correct
- Test validator startup after fixes
- Document standardized configuration
Day 3-4: Health Monitoring
- Deploy
scripts/monitoring/check-validator-health.shto all validators - Set up cron jobs for health checks (every 2 minutes)
- Test health check script
- Verify alerts are working
Day 5-6: Block Production Monitoring
- Deploy
scripts/monitoring/monitor-block-production.sh - Set up continuous monitoring
- Configure alerts for block stalls
- Test alerting system
Day 7: Transaction Pool Monitoring
- Deploy
scripts/monitoring/monitor-transaction-pool.sh - Set up monitoring for stuck transactions
- Test cleanup procedures
- Document transaction management
Detailed Implementation Steps
Phase 1: Immediate Actions (This Week)
Step 1.1: Standardize All Validator Configurations
# Run auto-fix script
./scripts/monitoring/auto-fix-validator-config.sh
# Verify fixes
./scripts/monitoring/check-validator-health.sh
Expected Outcome: All validators have consistent, correct configuration
Step 1.2: Deploy Health Monitoring
# Setup monitoring on all validators
./scripts/monitoring/setup-validator-monitoring.sh
# Test health checks
./scripts/monitoring/check-validator-health.sh
Expected Outcome: Continuous health monitoring active on all validators
Step 1.3: Deploy Block Production Monitor
# Start block production monitor (run as service)
nohup ./scripts/monitoring/monitor-block-production.sh > /var/log/block-monitor.log 2>&1 &
Expected Outcome: Continuous block production monitoring with alerts
Step 1.4: Deploy Transaction Pool Monitor
# Start transaction pool monitor
nohup ./scripts/monitoring/monitor-transaction-pool.sh > /var/log/txpool-monitor.log 2>&1 &
Expected Outcome: Continuous transaction pool monitoring
Phase 2: Enhanced Monitoring (Week 2)
Step 2.1: Create Monitoring Dashboard
- Aggregate health data from all validators
- Real-time status display
- Historical trend analysis
Step 2.2: Implement Alerting System
- Email alerts for critical issues
- SMS alerts for emergencies
- Slack/Discord integration
Step 2.3: Create Recovery Automation
- Automatic validator restart on failure
- Automatic configuration fix
- Automatic transaction pool cleanup
Phase 3: Advanced Features (Week 3-4)
Step 3.1: Predictive Monitoring
- Detect issues before they cause failures
- Trend analysis
- Capacity planning
Step 3.2: Performance Optimization
- Optimize validator performance
- Reduce resource usage
- Improve block production rate
Step 3.3: Documentation and Runbooks
- Complete operational documentation
- Troubleshooting runbooks
- Recovery procedures
Success Metrics
Stability Targets
- Block Production Uptime: > 99.9%
- Validator Availability: > 99.5%
- Mean Time to Detection (MTTD): < 2 minutes
- Mean Time to Recovery (MTTR): < 5 minutes
Monitoring Coverage
- ✅ All validators monitored
- ✅ Block production monitored
- ✅ Transaction pool monitored
- ✅ Network health monitored
Maintenance Schedule
Daily
- Review health check reports
- Check for alerts
- Verify block production
Weekly
- Comprehensive health audit
- Review monitoring metrics
- Update documentation
Monthly
- Performance review
- Capacity planning
- Process improvements
Status: Ready for implementation
Priority: Start with Phase 1 immediately
Timeline: 4 weeks for full implementation