5.4 KiB
5.4 KiB
Smart Accounts Kit Deployment Checklist
Date: 2026-01-26
Network: ChainID 138 (SMOM-DBIS-138)
Pre-Deployment Checklist
Environment Setup
- Foundry installed and configured
- Node.js installed (v18+)
- Environment variables configured (
.env) - RPC endpoint accessible
- Deployer has sufficient ETH for gas
- Private key secured and backed up
Configuration
RPC_URL_138set in.envPRIVATE_KEYset in.envSMART_ACCOUNT_FACTORYaddress (if deploying)ENTRY_POINTaddress (if deploying)PAYMASTERaddress (optional)
Phase 1: Foundation Deployment
Install SDK
- Run
./scripts/install-smart-accounts-sdk.sh - Verify SDK installed correctly
- Check
node_modules/@metamask/smart-accounts-kitexists
Deploy Contracts
- Deploy EntryPoint contract
forge script script/smart-accounts/DeploySmartAccountsKit.s.sol \ --rpc-url $RPC_URL_138 --broadcast - Record EntryPoint address
- Deploy AccountFactory contract
- Record AccountFactory address
- Deploy Paymaster contract (optional)
- Record Paymaster address
Update Configuration
- Update
config/smart-accounts-config.jsonwith addresses - Verify configuration is correct
- Test configuration loading
Phase 2: AccountWalletRegistry Integration
Deploy Extended Registry
- Deploy AccountWalletRegistryExtended
forge script script/smart-accounts/DeployAccountWalletRegistryExtended.s.sol \ --rpc-url $RPC_URL_138 --broadcast - Record AccountWalletRegistryExtended address
- Grant ACCOUNT_MANAGER_ROLE to authorized addresses
- Verify roles are set correctly
Integration Testing
- Test linking EOA wallet
- Test linking Smart Account
- Test
isSmartAccount()function - Test
getSmartAccounts()function - Verify events are emitted
Phase 3: Testing
Unit Tests
- Test smart account creation
- Test AccountWalletRegistry linking
- Test delegation framework
- Test Advanced Permissions
- Test user operations batching
Integration Tests
- Test Smart account + RailEscrowVault
- Test Smart account + SettlementOrchestrator
- Test Delegation + Payment rails
- Test Advanced Permissions + dApps
- Test AccountWalletRegistry with both EOA and smart accounts
End-to-End Tests
- Test complete payment rail flow with smart account
- Test complete dApp interaction flow
- Test hybrid EOA + smart account flow
- Test delegation expiry and renewal
- Test permission lifecycle
Phase 4: Security
Security Audit
- Audit EntryPoint contract
- Audit AccountFactory contract
- Audit Paymaster contract (if deployed)
- Audit AccountWalletRegistryExtended contract
- Fix any security issues found
Access Control
- Verify role-based access control
- Test permission checks
- Verify admin functions are protected
- Test emergency pause (if applicable)
Phase 5: Production Deployment
Final Checks
- All tests passing
- Security audit complete
- Documentation complete
- Configuration verified
- Monitoring set up
Deployment
- Deploy to production network
- Verify contracts deployed correctly
- Update production configuration
- Test production deployment
- Monitor for issues
Post-Deployment
- User acceptance testing
- Performance testing
- Load testing
- Monitor metrics
- Document deployment addresses
Verification Steps
Contract Verification
- Verify EntryPoint on block explorer
- Verify AccountFactory on block explorer
- Verify Paymaster on block explorer (if deployed)
- Verify AccountWalletRegistryExtended on block explorer
Functionality Verification
- Create test smart account
- Link smart account to test account
- Test delegation request
- Test permission request
- Test batch operations
Documentation
User Documentation
- Smart Accounts User Guide complete
- FAQ document complete
- Troubleshooting guide complete
Developer Documentation
- Smart Accounts Developer Guide complete
- Delegation Usage Guide complete
- Advanced Permissions Guide complete
- API documentation complete
Deployment Documentation
- Deployment guide complete
- Configuration guide complete
- Troubleshooting guide complete
Monitoring and Maintenance
Monitoring Setup
- Set up contract monitoring
- Set up transaction monitoring
- Set up error alerting
- Set up performance monitoring
Maintenance
- Schedule regular security reviews
- Plan for upgrades
- Document maintenance procedures
- Set up backup procedures
Rollback Plan
If Issues Occur
- Document rollback procedure
- Test rollback procedure
- Keep EOA support active (backward compatible)
- Have emergency pause ready (if applicable)
Success Criteria
Technical
- All contracts deployed successfully
- All tests passing
- Security audit passed
- Performance meets requirements
User Experience
- Users can create smart accounts
- Users can link smart accounts
- Delegation works correctly
- Permissions work correctly
Last Updated: 2026-01-26