Files
metamask-integration/ALL_TASKS_LIST.md
2026-03-02 12:14:14 -08:00

7.5 KiB

All MetaMask Integration Tasks

Date: 2026-01-26
Status: Comprehensive task list


Completed Tasks

Future Extensibility (All Complete)

  1. MetaMask Embedded Wallets Integration - Complete guide and configuration
  2. Complete Token Logo Configuration - All tokens with logo URLs
  3. Contract Tagging and Names - All contracts tagged and categorized
  4. Bridge Configuration - All bridges documented and configured
  5. Multi-Chain Support Structure - Ready for additional chains

Smart Accounts Kit Analysis (All Complete)

  1. Review Smart Vault vs Smart Accounts Kit - Comparison complete
  2. Create Smart Accounts Kit deployment scripts and guides
  3. Create integration roadmap for Smart Accounts Kit

Pending Tasks

Phase 1: Smart Accounts Kit Foundation (Weeks 1-2)

Goal: Deploy Smart Accounts Kit infrastructure

Deployment Tasks

  • Install Smart Accounts Kit SDK (npm install @metamask/smart-accounts-kit)
  • Create Foundry deployment script for EntryPoint contract
  • Create Foundry deployment script for AccountFactory contract
  • Create Foundry deployment script for Paymaster contract (optional)
  • Deploy EntryPoint contract to ChainID 138
  • Deploy AccountFactory contract to ChainID 138
  • Deploy Paymaster contract to ChainID 138 (optional)
  • Configure Smart Accounts Kit for ChainID 138
  • Test smart account creation
  • Verify smart account functionality

Deliverables:

  • Smart Accounts contracts deployed
  • Deployment scripts ready
  • Basic smart account creation working

Phase 2: AccountWalletRegistry Integration (Weeks 3-4)

Goal: Integrate Smart Accounts with existing AccountWalletRegistry

Integration Tasks

  • Review AccountWalletRegistry contract
  • Design AccountWalletRegistry extension interface
  • Implement linkSmartAccount() function
  • Implement isSmartAccount() detection function
  • Add smart account creation on link (optional auto-create)
  • Support both EOA and smart accounts in registry
  • Update AccountWalletRegistry API documentation
  • Test AccountWalletRegistry integration
  • Test linking EOA wallets
  • Test linking smart accounts
  • Test hybrid EOA + smart account scenarios

Deliverables:

  • AccountWalletRegistry supports smart accounts
  • Smart accounts auto-created on link (optional)
  • Both EOA and smart accounts supported

Phase 3: Delegation Framework (Weeks 5-6)

Goal: Implement delegation for payment rails and dApps

Delegation Implementation Tasks

  • Review MetaMask Smart Accounts Kit delegation framework
  • Design delegation rules for payment rails
  • Design delegation rules for dApps
  • Implement delegation framework
  • Create delegation rules configuration
  • Enable permission sharing
  • Implement delegation expiry handling
  • Test delegation flows
  • Test delegation with payment rails
  • Test delegation with dApps
  • Create delegation examples
  • Document delegation usage

Deliverables:

  • Delegation framework implemented
  • Delegation rules configured
  • Delegation examples created

Phase 4: Advanced Permissions (ERC-7715) (Weeks 7-8)

Goal: Implement ERC-7715 Advanced Permissions

ERC-7715 Implementation Tasks

  • Review ERC-7715 standard specification
  • Design Advanced Permissions system
  • Implement ERC-7715 standard contracts
  • Enable permission requests from dApps
  • Implement permission approval flow
  • Implement permission revocation flow
  • Manage permission lifecycle
  • Test permission request flows
  • Test permission approval flows
  • Test permission revocation flows
  • Create permission examples
  • Document Advanced Permissions usage

Deliverables:

  • ERC-7715 implemented
  • Permission requests working
  • Permission examples created

Phase 5: Testing & Quality Assurance (Ongoing)

Goal: Comprehensive testing of all features

Unit Tests

  • Test smart account creation
  • Test AccountWalletRegistry linking
  • Test delegation framework
  • Test Advanced Permissions
  • Test user operations batching
  • Test gas abstraction

Integration Tests

  • Test Smart account + RailEscrowVault integration
  • Test Smart account + SettlementOrchestrator integration
  • Test Delegation + Payment rails integration
  • Test Advanced Permissions + dApps integration
  • Test AccountWalletRegistry with both EOA and smart accounts

End-to-End Tests

  • Test complete payment rail flow with smart account
  • Test complete dApp interaction flow
  • Test hybrid EOA + smart account flow
  • Test delegation expiry and renewal
  • Test permission lifecycle

Phase 6: Production Deployment (Weeks 9-10)

Goal: Deploy to production and finalize

Production Tasks

  • Security audit of smart accounts contracts
  • Security audit of AccountWalletRegistry extensions
  • Security audit of delegation framework
  • Security audit of Advanced Permissions
  • Production deployment of contracts
  • Production deployment of SDK configuration
  • Integration testing in production
  • User acceptance testing
  • Performance testing
  • Load testing
  • Documentation completion
  • User guides creation
  • Developer guides creation
  • API documentation updates

Deliverables:

  • Production deployment complete
  • All features tested
  • Documentation complete

📋 Additional Tasks

Documentation Tasks

  • Create Smart Accounts user guide
  • Create Smart Accounts developer guide
  • Create delegation usage guide
  • Create Advanced Permissions guide
  • Update main README with Smart Accounts info
  • Create troubleshooting guide for Smart Accounts

Infrastructure Tasks

  • Set up monitoring for smart accounts
  • Set up alerting for smart accounts
  • Configure analytics for smart accounts usage
  • Set up backup and recovery procedures

Community & Support Tasks

  • Create community support channels
  • Prepare FAQ for Smart Accounts
  • Create video tutorials
  • Prepare outreach materials

📊 Task Summary

Category Completed Pending Total
Future Extensibility 5 0 5
Smart Accounts Analysis 3 0 3
Phase 1: Foundation 0 10 10
Phase 2: Integration 0 11 11
Phase 3: Delegation 0 12 12
Phase 4: Advanced Permissions 0 12 12
Phase 5: Testing 0 16 16
Phase 6: Production 0 13 13
Additional Tasks 0 10 10
TOTAL 8 84 92

🎯 Priority Tasks

High Priority (Immediate)

  1. Install Smart Accounts Kit SDK
  2. Deploy EntryPoint contract
  3. Deploy AccountFactory contract
  4. Test smart account creation

Medium Priority (Short-term)

  1. Extend AccountWalletRegistry
  2. Implement delegation framework
  3. Create unit tests
  4. Security audit

Low Priority (Long-term)

  1. Advanced Permissions (ERC-7715)
  2. Production deployment
  3. Community support setup
  4. Video tutorials

📅 Timeline

Phase Duration Start End
Phase 1: Foundation 2 weeks TBD TBD
Phase 2: Integration 2 weeks TBD TBD
Phase 3: Delegation 2 weeks TBD TBD
Phase 4: Advanced Permissions 2 weeks TBD TBD
Phase 5: Testing Ongoing TBD TBD
Phase 6: Production 2 weeks TBD TBD
Total 10 weeks TBD TBD

Last Updated: 2026-01-26