Complete Migration Guide
Date: 2025-01-27 Purpose: Comprehensive guide for all migration types Status: Complete
Overview
This guide provides comprehensive instructions for migrating projects to shared infrastructure, services, and monorepos.
Migration Types
1. Monitoring Migration
Purpose: Migrate projects to shared monitoring stack
Steps:
- Ensure service exposes metrics endpoint
- Add metrics port to service
- Create ServiceMonitor resource
- Apply ServiceMonitor
Script: scripts/migrate-to-monitoring.sh
Guide: See docs/K8S_MIGRATION_GUIDE.md
2. Kubernetes Migration
Purpose: Migrate projects to shared Kubernetes cluster
Steps:
- Create namespace
- Create deployment
- Create service
- Create ingress
- Configure monitoring
- Test deployment
Script: scripts/migrate-to-k8s.sh
Guide: See docs/K8S_MIGRATION_GUIDE.md
3. API Gateway Migration
Purpose: Migrate projects to unified API gateway
Steps:
- Register service with gateway
- Configure routes
- Set up authentication
- Configure rate limiting
- Update client applications
- Test endpoints
Script: scripts/migrate-to-api-gateway.sh
Guide: See docs/API_GATEWAY_MIGRATION_GUIDE.md
4. Shared Packages Migration
Purpose: Migrate projects to use shared packages
Steps:
- Install shared packages
- Update imports
- Remove duplicate code
- Update configuration
- Test functionality
Script: scripts/migrate-to-shared-packages.sh
Guide: See docs/SHARED_PACKAGES_MIGRATION_GUIDE.md
5. Terraform Migration
Purpose: Migrate projects to use shared Terraform modules
Steps:
- Review current infrastructure
- Identify modules to use
- Update Terraform configuration
- Update resource references
- Test migration
- Apply changes
Script: scripts/migrate-terraform.sh
Guide: See docs/TERRAFORM_MIGRATION_GUIDE.md
6. DBIS Monorepo Migration
Purpose: Migrate DBIS projects to monorepo
Steps:
- Set up monorepo structure
- Migrate projects
- Set up shared packages
- Configure CI/CD
- Test migration
Script: scripts/migrate-dbis-project.sh
Guide: See docs/DBIS_MONOREPO_MIGRATION_PLAN.md
Migration Checklist
Pre-Migration
- Review migration guide
- Assess project complexity
- Create backup
- Set up test environment
- Prepare rollback plan
During Migration
- Follow step-by-step guide
- Test each step
- Document changes
- Verify functionality
Post-Migration
- Verify all services
- Test integrations
- Update documentation
- Monitor metrics
- Train team
Best Practices
Planning
- Start with low-risk projects
- Test in dev/staging first
- Have rollback plan ready
- Communicate with team
Execution
- Follow guides step-by-step
- Test thoroughly
- Document changes
- Monitor closely
Post-Migration
- Verify everything works
- Update documentation
- Share learnings
- Optimize as needed
Troubleshooting
Common Issues
- Configuration errors
- Network connectivity
- Resource conflicts
- Permission issues
Solutions
- Check logs
- Verify configurations
- Review documentation
- Ask for help
Support
Resources
- Migration guides in
docs/ - Helper scripts in
scripts/ - Example configurations
- Troubleshooting sections
Getting Help
- Review documentation
- Check examples
- Review similar migrations
- Ask team members
Last Updated: 2025-01-27