3.0 KiB
3.0 KiB
IRU Production Deployment Checklist
Pre-Production Deployment Verification
Prerequisites
- Proxmox VE infrastructure operational
- Keycloak authentication service operational
- Database migrations completed
- Environment variables configured
- SSL certificates installed
- Network connectivity verified
- Monitoring systems operational
Marketplace Deployment
- Marketplace frontend deployed
- Marketplace API routes registered
- Database schema migrated
- Sample offerings created
- Marketplace accessible via public URL
- Inquiry submission tested
- Email notifications configured
Portal Deployment
- Portal frontend deployed
- Portal API routes registered
- Keycloak integration verified
- Dashboard data loading
- Service monitoring connected
- Deployment status tracking working
Qualification Engine
- Qualification services deployed
- Qualification API routes registered
- Workflow engine operational
- Regulatory database connections (if applicable)
- Qualification testing completed
Agreement Generation
- Agreement generator service deployed
- Agreement templates installed
- E-signature provider configured
- Agreement API routes registered
- Agreement generation tested
- E-signature flow tested
Provisioning & Deployment
- Provisioning service deployed
- Proxmox VE integration configured
- Deployment orchestrator operational
- Deployment API routes registered
- Test deployment completed
- Container provisioning verified
Connectors
- Connector plugins registered
- Connector configurations verified
- Connector connectivity tested
- Data mapping validated
SDK Libraries
- SDK packages published
- SDK documentation available
- SDK examples provided
- SDK testing completed
Security
- Authentication configured
- Authorization rules applied
- API rate limiting enabled
- SSL/TLS configured
- Firewall rules applied
- Security monitoring active
- Audit logging enabled
Monitoring
- Service health monitoring
- Performance metrics collection
- Alerting configured
- Dashboard access verified
- Log aggregation working
Documentation
- Integration guides published
- API documentation available
- Quick start guide available
- Security documentation available
Testing
- Unit tests passing
- Integration tests passing
- E2E tests passing
- Performance tests completed
- Security tests completed
Go-Live
- All checklist items completed
- Stakeholder sign-off obtained
- Support team trained
- Rollback plan prepared
- Communication plan executed
Post-Deployment
- Monitor initial transactions
- Verify service health
- Check error rates
- Validate monitoring alerts
- Collect user feedback
- Document issues and resolutions